Outside view of enclosed lean-to. The batten part of board and batten will be done at a later date.
Inside view of lean-to/hay storage area.
Enclosing the hay loft.
One side of the loft done ! Much more framing of windows and doors to be done, but we can put the sheep in the lean-to in prep for the shearer and he can shear under the roof if he so chooses.
Gratuitous child with chick shot.
No comments:
Post a Comment